28 results
6-K
EX-99.2
ORLA
Orla Mining Ltd
3 Aug 23
Condensed Interim Consolidated Financial Statements
5:07pm
dump, open pits, and processing areas.
Evaluate the availability of local services and personnel to maximize local hiring and procurement.
Investigate
6-K
EX-99.2
ORLA
Orla Mining Ltd
11 May 23
Condensed Interim Consolidated Financial Statements
6:38pm
geotechnical studies at the proposed heap leach, waste rock dump, open pits, and processing areas.
Evaluate the availability of local services
6-K
EX-99.1
ORLA
Orla Mining Ltd
29 Nov 22
Report of Foreign Private Issuer for the Month of November 2022
6:41pm
, and in Sections 3, 4, 5, 6, 8, and 9 in T30N, R53E (Dufresne and Nicholls, 2017b). AMAX also conducted surface dump and rock chip sampling, soil sampling
6-K
EX-99.2
ORLA
Orla Mining Ltd
10 Nov 22
Condensed Interim Consolidated Financial Statements
5:27pm
, Caballito, La Pelona, and La Prieta for gold-copper mineralization. The current design allows the heap leach pad and the waste rock dump … and groundwater flows, quality, storage, and treatment.
Complete additional geotechnical studies at the proposed heap leach, waste rock dump, open pits
6-K
EX-99.2
ORLA
Orla Mining Ltd
8 Aug 22
Condensed Interim Consolidated Financial Statements
5:53pm
leach pad and the waste rock dump to accommodate additional tonnage in the upstream site of those facilities if required.
Based on the results … at the proposed heap leach, waste rock dump, open pits, and processing areas.
Evaluate the availability of local services and personnel to maximize local hiring
6-K
EX-99.2
vp6s t8u8m22
12 May 22
Condensed Interim Consolidated Financial Statements
5:19pm
40-F
EX-99.2
j4zc92e
18 Mar 22
Annual report (Canada)
9:18pm
40-F
EX-99.1
cfeoek 3vtz7
18 Mar 22
Annual report (Canada)
9:18pm
6-K
EX-99.1
iiga3
20 Jan 22
Updated NI 43-101 Technical Report on the Cerro Quema Project
4:27pm
6-K
EX-99.2
b76w cgnr6h0gz9
15 Nov 21
Condensed Interim Consolidated Financial Statements
6:52am
6-K
EX-99.2
cvv0v8co hq
7 Sep 21
Orla Mining Files Cerro Quema Oxide Project Pre-feasibility Study Technical Report
5:25pm
6-K
EX-99.1
vhve2it0u19m0j461yah
9 Aug 21
Material Change Report Under National Instrument 51-102
4:42pm
6-K
EX-99.1
m639i9gr0xk2wy o5l3
6 Aug 21
Orla Mining Reports Second Quarter 2021 Results and Provides Camino Rojo Construction Update
12:00am
6-K
EX-99.2
rqo5qsywhqitk7
6 Aug 21
Condensed Interim Consolidated Financial Statements
12:00am
6-K
EX-99.1
ujlwd y9tn6p8lh0e
28 Jul 21
Current report (foreign)
9:39am
SUPPL
2gh zxwky
6 Jul 21
Supplemental materials (foreign)
6:02am
6-K
EX-99.2
70co9azmj1vtmamhh
13 May 21
Condensed Interim Consolidated Financial Statements
4:47pm
40-F
EX-99.2
tzv199c3qsybw
22 Mar 21
Annual report (Canada)
12:00am
40-F
EX-99.1
3bkn nmvxyjbk348
22 Mar 21
Annual report (Canada)
12:00am
F-10/A
jriretomac y6m
12 Mar 21
Registration of securities (Canada) (amended)
4:28pm